We are a specialist building contracting organisation delivering a broad range of property repairs on commercial projects, often smaller in size and nature.
About Us
Oswald Property Services is a specialist building contracting organisation delivering a broad range of property repairs on commercial projects, often smaller in size and nature.
Since its formation in 2002 NCS Ltd had undertaken all property repair projects alongside its other projects in other operating sectors.
It became obviously apparent that our work in the property repair sector needed to have its own identity, and so in 2023 Oswald Property Services Ltd was formed.
We wanted to provide our clients with a dedicated service with a team that could focus on delivering projects without the distraction of other projects with competing priorities and demands on resources.
Relying on our extensive experience gained since NCS Ltd was formed 2002 on a whole range of projects across multiple commercial sectors in
Oswald Property Services, we now have a dedicated focus on delivering projects in the property repair sector that require outstanding performance, service, and quality.
Over the years we have developed a strong capability to deliver property repairs and smaller projects that include alterations and upgrades, structural repairs, envelope repairs, void and dilapidation repairs and works of a smaller nature.
We recognise that these projects can often be neglected due to their size and scope, however we work hard to ensure that all our client’s projects receive the same level of outstanding attention, care, professionalism, and commitment.
Case Studies
Haven Court – End of Life Care Facility
South Shields
The works comprised the internal modifications and external works at an existing dementia care facility to create a new End of Life Care facility.
The works included:
- Demolition & soft strip
- Forming openings & structural alterations
- New ceilings & partitions
- New internal doors & reception desk
- New external doors & windows
- Mechanical & electrical installations
- New floor & wall finishes
- Fencing and decking
The works were undertaken in an occupied building and required careful planning, management and control of all operations to ensure that the operations of the clinical setting were not disrupted. Close liaison with the users of the building was required on a day to day basis.
Sunderland Homes
Sunderland
This project for Sunderland Homes involved the internal refurbishment of the property and installation of a concrete footpath to the front of the property.
The works involved:
- Installation of concrete footpath
- Installation of new kitchen units
- Installation of new bathroom units
- Boiler service and check of existing heating system
- Electrical Installation Condition Report
- Installation of carbon monoxide, smoke and heat detectors
- Installation of security light to rear of property
- Decorative finishes
STEPS Wet Room
Sheffield
This project for STEPS Rehabilitation Limited involved the survey, investigation and rectification of a drainage problem from the wet rooms into the adjacent bedrooms.
The works included:
- Removal of existing floor coverings
- Repair/replace damaged substrate.
- Replacement of damaged skirtings
- Creation of falls using renovation screed
- Incorporation of bump strip
- Laying new Altro flooring
- Decoration
The works were carried out in an occupied and fully operational building in a clinical setting which required careful planning, management, co-ordination, and control of the works.
So as not to disrupt the operation of the unit the works were carried out on a room-by-room basis between patient occupancy.
Want to work with us, contact us to find out how we can help.
© NCS Group Holdings Ltd 2023. | Site by NEARO